• The Helios 600 is currently being installed. We will let everyone know when it is running and our training is completed.

  • The CM200 is still down with an X-tilt pivot point problem.

  • All TEM sample exchange will be handled by Henk.

  • The Scintag PAD-V XRD is available. While we replace the lead glass window, we installed a steel plate in the opening as a safety shield.

  • The Bruker D8 has been aligned and we're getting operational procededures in place.